Main Business

Dongsun Water Plant Rehabilitation Project of Baise City

2024-08-23| light industry| 0 Views

●  Capacity: Current capacity: 50,000 m³/d,Future expansion: 150,000 m³/d (reserved / planned)

●  Owner: Guangxi Baise Youjiang Water Co., Ltd

●  Construction site: Baise, Guangxi, China

●  Project HighlightsThis project is one of the major water plants in the prefecture-level city, comprising a grid flocculation tank, a horizontal sedimentation tank, a V-shaped filter tank, a clear water tank, a water supply pumping house, chemical feed and disinfection rooms, as well as auxiliary facilities such as a supporting office building.

●  Project OverviewThis project is one of the main water plants in a prefecture level city, including grid flocculation tanks, horizontal sedimentation tanks, V-shaped filters, clean water tanks, water supply pump rooms, dosing and disinfection rooms, and supporting office buildings and other ancillary facilities. The entire design management and production zoning are advanced in technology and have high self-control programs. Among them, the project adopts the construction of a flocculation advection sedimentation upper and lower stacked clear water tank (our company's patent), and some areas in the water supply pump room have recently been used for raw water upgrading, which is efficient, energy-saving, and saves investment.

top