●Capacity: Two (2) units of 75 t/h sub-high-pressure bagasse-fired boilers, one (1) 13 MW back-pressure turbine unit, and one (1) 13 MW extraction-condensing turbine unit.
● Owner: Ethiopian Sugar Industry Group (ESIG)
● Construction site: Afar Regional State, Ethiopia
● Project Highlights: This project is a biomass power generation facility supporting the KESEN 6,000 tonnes of cane per day sugar mill in Ethiopia.
● Project Overview: This project is a biomass power generation project supporting the KESEN sugar factory in Ethiopia, which has a daily sugar refining capacity of 6,000 tons. The scale of the project includes 2×75t/h sub-high pressure bagasse boilers, 1×13MW back pressure unit, and 1×13MW extraction condensing unit.