● Capacity: Site area: approx. 550 mu (36.7 ha),GFA: 173,600 m²
● Owner: Alnan Aluminum Co., Ltd.
● Construction site: Nanning, Guangxi, China
●Project Highlights: The project consists of three phases (Phase I to Phase III) with a total investment of 2,113.08 million RMB. It includes production workshops, auxiliary buildings, and a headquarters base, covering workshops and sections such as melting and casting, cold rolling, foil rolling, and surface anodizing.