●Capacity: Planned site area: 65 mu (approx. 43,333 m² / 4.33 ha),Storage capacity: 400MW/800MWh
● Owner: Qujing Guangchu Energy Technology Co., Ltd.
● Construction site: Qujing,Yunnan, China
●Project Highlights: This project is planned to cover a site area of 65 mu (approximately 43,333 m²) and involves the construction of a 400MW/800MWh energy storage power station. The station consists of 80 sets of 5MW/2×5MWh energy storage subsystems. A new 220kV step-up substation will be built, equipped with two 200MVA main transformers. The 220kV side of the substation adopts a single-circuit/double-circuit mixed transmission arrangement, connecting to the 220kV side of the China Southern Power Grid 500kV Longhai Substation via a newly constructed transmission line of approximately 11.6 km.